How Long Does It Take To Remodel A Kitchen? A Quick Overview

How long does it take to remodel a kitchen?

For a standard-size kitchen, it takes around 6 to 9 weeks for a complete remodel,

For a smaller kitchen, it may take 3 to 4 weeks and

For larger kitchen sizes, remodeling could last for 10 to 12 weeks.

Your kitchen remodeling depends on various factors like

  • The scope of changes you wish to make
  • The type of design you choose,
  • The size of your kitchen, etc.

If your renovation includes only some fixes and repairs, it’s only a matter of days.

However, the time frame would expand if you go for a complex design for your remodel or choose a trending style for your kitchen.

Another critical factor is the size of your kitchen; a larger kitchen requires more of everything so that it would take more time.   

One thing that adds to the complexity of remodeling a kitchen is the number of professionals involved, i.e.,

  • Electricians,
  • Plumbers,
  • Carpenters
  • Other subcontractors.

Each one has to adjust according to the timeline of the other.

Kitchen Remodel Timeline

timeline for kitchen remodeling

The kitchen remodeling timeline has six distinct phases after the initial design phase.

Establishing the design of your kitchen is a prudent decision

As it will save you from the mid-project bargains and compromises, and with all of your preferences set straight.

The rest of the process will go swiftly.

It can be easily done in 2 weeks.  

The designing phase includes decision-making like;

  • What you need
  • What you want
  • Your budget
  • What features of the kitchen you don’t want to remove, etc.

Demolition

Once the design is done, the actual remodeling phase starts with demolition.

This phase is noisy and perhaps the most disturbing as it includes removing all the elements of your kitchen that you want to change.

During this phase, you will experience a lot of clutter and dirt.

It will take around a week.

Adding New Features

The next phase includes adding any new features that you have decided on during the design phase.

It may be a window, a new wall, a partition, constructing an island, etc.

During this building phase, nearly all sub-contractors like the plumber, electrician, and carpenter will be needed.

2 to 4 weeks are needed for this.

Flooring and Drywall

After this comes the flooring and drywall phase.

This is also called the final construction phase.

This includes putting the surfaces of the floors and walls.

It doesn’t take long and is finished within a week or two.

Cabinet and Countertop Installation

After adding new features to your kitchen layout, now it’s time for the installation of cabinets and countertops.

Cabinets might be installed quicker than the countertops, as the countertops need to be cut to fit your space.

It is done in 3 to 5 days.

Fixtures and Appliances Installation

The next step in the kitchen remodeling timeline includes the installation of fixtures and appliances.

This takes under a week to get done.

Cleanup

The last phase is the cleanup.

Here you will get your new kitchen spotless and beautiful, and any dumpster will be hauled away.

How to Plan a Kitchen Remodel

Planning is where it all starts.

All the vitals of the remodeling will be decided and finalized in this phase.

Following are some elements you must consider in planning your kitchen remodeling;

Cabinets

Start with cabinets as they hold significance in establishing the style of your kitchen.

Do you want something classic, or are you planning to go with the trends?

Whatever is your liking, decide in the planning phase.

Kitchen Appliances

As you are remodeling, deciding on any new appliances you would like or any replacements is a good idea.

A cutting-edge appliance will ease your chores in the kitchen and give your kitchen a modern look.

Also, decide where you want to place each appliance, considering the workflow.

Layout

Then comes the layout of your kitchen.

It should be functional but appealing enough that one would want to go there.

Decide on the placement of your stove, refrigerator, and sink, the most used appliances in the kitchen.

Enough space should be left for a few people to work together.

Colors

Deciding the color palette for your kitchen is one of the most important things to choose.

It includes deciding the colors for your floor, cabinets, walls, etc.

Neutrals and classic colors are easier to change than bold colors.

Kitchen Flooring

The flooring of the kitchen should be sturdy, and hard-wearing as the kitchen is the most used room in the house.

It should also be easy to clean.

Wooden flooring is preferred for a kitchen, but you can also go with porcelain with a wooden effect.

Countertop Material

Counter Top material should also be decided before starting the remodeling process.

For the countertop, it’s not just the color that is important but also the material it is made of.

If you opt for a natural stone you may have to be more careful in cleaning and protecting it from spills and dirt.

What to Consider When Remodelling a Kitchen

how long does it takes to remodel a kitchen

There are a lot of things to keep in mind while remodeling like hiring a

  • Professional
  • Budgeting
  • Timeframe
  • Permits
  • Functionality
  • Space etc.

Budget

First of all, you need to consider your budget, and everything else will come later.

Timeframe

Next, you need to set out the time frame, because you most probably won’t be able to use your kitchen while it’s being remodeled so decide how much time can you attribute to it.

Hiring a Professional

Then you need to decide if you want to hire a professional to do it, or if you want to give it a try yourself.

Taking the advice of a professional will give your kitchen a more bespoke look.

But experimenting on your own has a different charm as well.

Permits and Litigations

Then decide if you need any permits for a special upgrade that you are deciding to make.

Make sure you are aware of the litigations that come with any changes that you want to make in the kitchen space and styling.

Functionality

While remodeling you need to consider functionality if that is neglected any of the other considerations might not be just as useful.

Consider the number of people that might be working in the kitchen at a time and ensure that there is enough space for each of them to work together.

Steps to Remodel a Kitchen

  • Remodeling a kitchen starts with planning.
  • Once everything is planned and considered then the demolition phase starts.
  • It’s better to hire a contractor to do it as it involves a lot of effort and you might make a mistake if you do it yourself.
  • Then comes the plumbing and electrical installation phase.
  • You can also replace any old electrical connections to avoid future problems.
  • Next comes the drywall and paint phase and this is where it starts getting interesting.
  • The design and color once done will set the theme of your kitchen.
  • Then comes the time to install the flooring. You might have already decided on what style of flooring to use.
  • It’s better to install the flooring at this point because after the placement of appliances and cabinets it would be hard to continue it under them.
  • Once the floor is set, the next step is cabinet installation.
  • A cabinet is a significant element of design in a kitchen so be thoughtful of the design and utility of the cabinets while selecting.
  • After the installation of the cabinets comes the selection and fixation of the countertop. 
  • Granite, quartz, and marble countertops are in trend these days.
  • Choose one that compliments the rest of the kitchen elements.
  • Finally, comes the appliances, whose places have been finalized in the planning phase and will be fixated into their designated stations.
  • As the remodeling comes to an end, there might be a need for some last-minute hardware fixes and touchups.

How Long Does it Take to Install Countertops?

Countertops directly affect your cooking and dining experience,

Their selection requires serious consideration in terms of material and design.

Regarding the installation of countertops, it’s different for different quality of stones used in it.

The easiest and quickest ones to install are the laminate countertops; they take

  • around 3 to 5 hours.

Countertops made of natural stone like marble or granite take longer to install i.e.;

  • Around 4 to 6 hours.

Wooden countertops take

  • 3 to 6 hours.

Other factors impacting the installation time include:

  • Size,
  • Number of labor involved
  • The skill of the labor force.

How Long Does it Take to Install Cabinets?

Cabinet installation normally takes around 2 to 3 days, but it depends on a host of other factors as well.

We are listing some of the factors here;

  • The size of the kitchen cabinets.
  • The size of the kitchen space.
  • The time spent in demolition.
  • The number of laborers.

What Is The Most Expensive Part of a Kitchen Remodel

A kitchen remodel is altogether the most expensive remodel in comparison to the other remodels in the house.

It involves a lot of work from professionals, i.e.;

  • Carpenter
  • Plumber,
  • Electrician
  • Designer

Out of all of those expenses involved in kitchen remodeling, the most expensive is the cabinet purchase and installation.

It can cover up to 20 to 40 percent of the entire budget.

That makes a big amount but it’s always worth it

As kitchen cabinets are one such feature of the kitchen that pops up and plays role in enhancing kitchen aesthetics and storage capacity of the kitchen.

Kitchen Demolition Services

Here are some of the US-based companies that offer Demolition services;

Junk Rescue

Screenshot of Junk Rescue homepage

It’s based in Arizona. They offer junk removal, demolition, and dumpster rental services.

Their demolition services include kitchen cabinet demolition, drywall demolition, construction removal, etc.

Check out here.

JBL Flooring Solutions

Screenshotof JBL Flooring Soultions homepage

It’s a family-owned business based in Southern Florida.

It offers services to residential and commercial clients.

Their services include flooring removal, demolition, and floor treatment services.

They offer bathroom and kitchen demolition services as well.

Check here.

Deconstruction Pro

Screenshot of Denconstruction Pro homepage

It is a California-based demolition services company.

Their service includes kitchen, bathroom, garage, spa demolition, etc.

Check here.

Trusted demolition

Screenshot of Residential demolition homepage

It is based in Las Vegas.

It offers deconstruction and demolition services.

They provide services from start to finish, from demolition to site clearing.

Check out here.

Final Words

The kitchen is that part of the house where everyone visits and it’s always in use.

It’s a good idea to remodel it to make it more convenient, functional, and beautiful.

Here we have discussed all of your potential concerns regarding remodeling, to make it easier for you.

Remodeling though can take around six to eight weeks

During that time you won’t be able to use your kitchen but it’s worth it as it adds to the value of your property and rejuvenates your kitchen area.